Service before failure. On schedule.
Quarterly or annual plans that catch issues before they break. AC service, plumbing checks, electrical safety — written reports, fixed-price contracts.
Annual peace of mind. Contracted.
Scheduled visits across every trade. We inspect, service, and write you a report. No surprises in the bill, no waiting for the breakdown.
Inspection
Full walk-through of every system. Photos, conditions noted, action items flagged.
AC
Coils cleaned, gas checked, filters swapped. Each unit logged with serial and date.
Plumbing
Pressure tests, leak checks, drain flushing. Catch the slow drip before it floods.
Electrical
Panel checks, RCD tests, load reads. Safety certificate issued each visit.
Exterior
Roof, gutters, sealing, paint. The bits no-one looks at until something fails.
Reports
Written record after every visit. PDF in your inbox, hard copy on file.
Five steps. One contract.
From the first conversation to the annual review — what to expect, and when.
- 01
Plan
We agree the cadence (quarterly or annual), the scope, and the price. One signed contract, no surprises.
- 02
Visit
We arrive on the scheduled date with the full toolkit. No call-outs needed, no surcharges.
- 03
Inspect & service
Every system checked against the contract. In-scope work is done on the visit; out-of-scope is quoted separately.
- 04
Action
Anything flagged that needs immediate fixing is handled the same day. Larger items are scheduled in.
- 05
Report
PDF report in your inbox by next day. Photos, readings, action items. Hard copy on file at our office.
To whoever called us,
Four things — in writing, every time:
- Every visit reported. Every system documented. Every defect flagged.
- Zero subcontractors. The crew you meet on visit one is the crew you meet on visit twelve.
- Fixed-price annual contract. No call-out surcharges, no upsells mid-visit.
- Fully licensed and insured in Qatar. Documents shared on request.
If we don't deliver, we don't bill.
